RWSN Library
Author
IDC
Year of Publishing
1981
Publisher
IDC International Drilling Consultants
Institution
Republic of Ghana, Ghana Water and Sewerage Corporation
Hand Pump Test Programme - Final Report (1981) + Follow-up reports (1986) 3000 Well Drilling Programme in Southern and Central Ghana
Description:
This report deals with the Hanpud Test Programme which was part of the Consulting Engineering Services for the 2000 Well Drilling Programmes in Southern and Central Ghana. The Federal Republic of Germany has financed the offshore costs of this project by a grant and loan; the onshore tests were financed by the Republic of Ghana through the Ghana Water and Sewerage Corporation, the project Sponsor.
After the draft of the present report, the Federal Republic of Germany has financed the setting up of a Maintenance Unit for the 3000 Well Drilling Prohrahhem, to training GWSC personnel and to practically execute the maintenance and repair of the pumps. The final report of this project, expected in 1986, will give further information on the experience gained with the selected pumps.
Bibliographical Information:
IDC (1981) Hand Pump Test Programme - Final Report (1981) + Follow-up reports (1986). 3000 Well Drilling Programme in Southern and Central Ghana , Republic of Ghana, Ghana Water and Sewerage Corporation , IDC International Drilling Consultants , Accra, Ghana
More Information
DOWNLOADS (9)
Hand Pump Test Programme (1981) - Part I
Hand Pump Test Programme (1981) - Part II
Hand Pump Test Programme (1981) - Part III
Hand Pump Test Programme (1981) - Annex 1 & 2
Report on Hand Pump Faults in Northern Region until March, 1986
System Costs of Hand Pump Operated Boreholes in Ghana and Costs for India Mark II and Moyno 1V12 Hand Pumps (October 1986)