Author
Tom Heath, Philip Tibenderana, Richard Carter,Kerstin Danert & Etsegenet Berhe

Year of Publishing
2009

Publisher
RWSN

Institution
Cranfield University, UNICEF, SDC, Skat

Borehole Costing Model V2.8 BETA & Quick Start Guide

Description:

This Borehole Costing Model is a spreadsheet in Microsoft Excel 2003

Once set up the model can quickly calculate the actual cost of a borehole (not the price). The first time the model is used it requires the unit costs to be entered for different materials and rigs. The model was built by Tom Heath, Richard Carter and Kerstin Danert. The model consists of three components: Model Unit Costs, Borehole Specifications and Results.


Bibliographical Information:

Tom Heath, Philip Tibenderana, Richard Carter,Kerstin Danert & Etsegenet Berhe (2009) Borehole Costing Model V2.8 BETA & Quick Start Guide. , 2.8 Beta , Cranfield University, UNICEF, SDC, Skat , RWSN


DOWNLOADS (1563)

Borehole Costing Model v2.8: Quick Start Guide

[pdf • Size: 0.07 MB]

Borehole Costing Model V2.8 BETA

[xls • Size: 0.78 MB]
« back to the last page